Skip to content
Mobilisation often within a few days
STRIP & CLEARSERVICESLTD

Site clearance contractors

Site Clearance Contractors in London & the South East

Site clearance is the removal of structures, materials, debris, obstructions and vegetation to leave a site safe, accessible and ready for its next use. It typically covers breaking out and removing what is left on the ground, clearing overgrowth, loading and carting away the material, segregating it for recycling, and handing back a clear site.

  • Debris & overgrowth removedRubble, structures and vegetation cleared
  • A clear, accessible siteReady for groundworks or the next trade
  • Registered waste carrierSegregated · transfer notes
  • Small sites from £800Fixed price after a free survey
Excavator with a sorting grab lifting broken slabs and brick rubble from a disused commercial yard
Cleared, level and readyPost-demolition · brownfield · overgrown sites

Need a site cleared before the next stage? We survey it, agree the scope and give you a fixed-price quotation. We reply to every enquiry within 24 hours.

Request a Free Site Survey

What's involved

What Does Site Clearance Involve?

Site clearance is about getting a site from its current state to a clean starting point for whatever comes next. What that means in practice depends on what is there now. After a demolition it may be broken slabs, rubble and the last of the structure. On a redundant or brownfield site it can be old buildings, hardstanding, fencing, overgrown vegetation and years of accumulated material.

Whatever the starting point, the work follows the same logic. Structures and obstructions are taken down or broken out and vegetation is cut back and cleared. Material is sorted as it is loaded, so recyclable streams such as metals, hardcore, timber and green waste are kept apart from general waste. Everything is removed under duty of care. The site is then left level and accessible, ready for the groundworks team or the main contractor.

Clearance is planned like any other site work. Access for plant and lorries, neighbours, ground conditions and any signs of contamination are assessed at the survey, and contaminated material is assessed and priced separately rather than loaded with general waste.

When you need us

When Do You Need Site Clearance?

  • After demolition

    Once the structure is down, the remaining arisings, slabs and obstructions have to go before groundworks can start.

  • Brownfield, redundant & overgrown sites

    Former commercial or industrial plots and land left unused often carry old buildings, hardstanding, scrub and accumulated material that must be cleared before redevelopment.

  • Live construction sites

    Clearing debris and surplus material between phases keeps a site safe and the programme moving.

  • Before groundworks or a sale

    A cleared site is easier to survey, price and build on, whether you are starting work yourself or preparing it for a buyer.

The difference

Site Clearance, Waste Clearance or Demolition?

The three are closely related and often happen on the same project, but they are different jobs.

Site clearance compared with waste clearance and demolition

  • Demolition

    What it deals with
    Standing buildings and structures
    When it is used
    When a building has to come down
  • Site clearance

    What it deals with
    Everything left on the ground: rubble, slabs, obstructions, vegetation, redundant structures
    When it is used
    Before groundworks, redevelopment or sale
  • Waste clearance

    What it deals with
    Construction and strip-out waste already generated by works
    When it is used
    During or after a project, to remove accumulated waste

If a building is still standing, the project starts with demolition. If the waste has already been generated by other trades and simply needs removing, waste clearance is the better fit. Site clearance sits between the two, turning a cluttered site into a clear one.

Vegetation

Clearing Overgrown Land and Vegetation

Overgrown plots are common on sites that have sat unused for a few years. Scrub, brambles and self-seeded growth can hide hazards such as old foundations, voids, fly-tipped waste and buried obstructions, so clearing vegetation is usually the first step towards understanding what a site really contains.

Two legal points shape when and how vegetation is cleared:

We plan clearance around both, so the work is done lawfully and does not create a bigger problem later.

Separate heaps of wood chippings and broken brick hardcore on a cleared site

Recycling

What Happens to Cleared Material

Most of what comes off a cleared site can be reused or recycled if it is kept separate. Brick and concrete can be crushed and reused as hardcore, metals go to recycling, timber and green waste are separated, and only what cannot be recovered goes as general waste.

We segregate material as it is loaded, target 95% or more diverted from landfill, and remove every load under the waste duty of care as a registered waste carrier, with waste transfer notes supplied. Good segregation is better for the environment and often for the budget too, because recyclable streams can cost less to dispose of than mixed waste.

How it works

Our Site Clearance Process

  1. Site survey & scope

    We walk the site, look at access, ground conditions, what needs clearing and any signs of contamination or protected habitat, and agree the scope before preparing a fixed-price quotation.

  2. Planning & RAMS

    We plan access, plant and waste routes, check timing around nesting birds where vegetation is involved, and prepare risk assessments and method statements under CDM 2015.

  3. Clearance & segregation

    Structures and obstructions are broken out, vegetation is cleared, and material is loaded and separated as the work proceeds.

  4. Level site & handover

    Remaining material is removed with full paperwork, the site is left level and accessible, and it is handed over ready for the next stage.

Ready to get started?

Need a Site Cleared?

Tell us what's on the site and what comes next. We'll survey it and give you a fixed-price quotation.

Free site survey · Fixed price · Segregated waste with full paperwork

Why choose us

Why Choose Us for Site Clearance

  • Clearance as part of a joined-up programme

    Clearance, soft strip and enabling works are carried out in-house, with demolition and groundworks available, so a site can go from occupied building to prepared plot with one contractor.

  • Responsible waste handling

    Segregation at source, a 95%+ landfill diversion target and full paperwork from a registered waste carrier.

  • Lawful vegetation clearance

    Timing and methods planned around nesting birds and invasive species.

  • Fast mobilisation

    Once the scope is agreed, local projects can often start within a few days.

We work to CDM 2015 with RAMS on every job, hold £10m public liability and employers' liability insurance, and our operatives are CSCS and CCDO trained.

Client testimonials

What Our Clients Say About Our Work

Google reviews

4.9/5

45+ reviews

Feedback from clients on demolition, strip out and site preparation projects.

  • “The Strip and Clear guys sorted our soft strip out in Surrey. Came in, stripped the office back to shell, took all the waste away and left it tidy. No messing about. Would use them again.”
    James TCommercial Soft Strip
  • “Used Strip & Clear for the demo and site clearance on a job in London. Lads turned up on time, cracked on with the strip and knock down, and got the site cleared properly with the transfer notes sorted. No drama. Good crew.”
    Dave M, Site ManagerDemolition & Site Clearance
  • “Strip & Clear Services Ltd handled the dig out and groundworks for us on a site in Kent. Professional team, clear communication and the ground was prepared exactly as agreed. Happy to recommend.”
    Sarah Collins, Apex DevelopmentsDig Out & Groundworks

Cost

How Much Does Site Clearance Cost?

Site clearance typically costs £500–£1,500 per day. Small sites start from around £800 and larger sites from around £2,500. A small commercial site clearance usually costs £1,500–£4,000, depending on volume.

Site clearance guide prices

  • Small sites

    Guide price
    From around £800
  • Larger sites

    Guide price
    From around £2,500
  • Small commercial site clearance

    Guide price
    £1,500 – £4,000
  • Day rate

    Guide price
    £500 – £1,500 per day

The main factors are the size of the site, the volume of material, access, any contamination risk, and how much of the material can be recycled rather than sent to landfill. Suspected contamination needs assessing before material is moved, as set out in the Environment Agency's land contamination risk management guidance, and contaminated or hazardous material is priced separately.

These are 2026 guide prices for London and Surrey, excluding VAT. Your fixed price follows a free site survey, and our price guide covers every service.

Frequently asked questions

Site Clearance FAQs

How much does site clearance cost?

Site clearance typically costs £500–£1,500 per day, with small sites from around £800 and larger sites from around £2,500, excluding VAT. Site size, volume, access, contamination and recycling are the main variables.

Do you clear overgrown land and vegetation?

Yes. We clear scrub, brambles and overgrowth as part of site clearance. During the bird nesting season, broadly March to August, vegetation is checked before clearing. Invasive plants such as Japanese knotweed need specialist treatment.

What happens if contaminated material is found?

It is kept separate from general waste, assessed, and priced separately before it is moved. Contaminated or hazardous material cannot simply be loaded and removed with ordinary clearance waste.

Do you remove concrete slabs and hardstanding?

Yes. Slabs, hardstanding and similar obstructions are broken out and removed as part of clearance where the scope requires it. Clean concrete and brick can usually be crushed and reused as hardcore.

How quickly can you clear a site?

Once the scope is agreed, local projects can often start within a few days. How long the clearance takes depends on the size of the site and the volume of material, and we give you a programme with the quotation.

Still have questions about your project?

Request a free quote

Tell Us About Your Project

Complete the short form below and our team will contact you to discuss your demolition or site preparation requirements.

Floor plans, drawings or photos (optional)

    Your details will only be used to respond to your enquiry. See our privacy policy.

    Get your free quote

    Get Your Site Cleared

    Whether it is the aftermath of a demolition, an overgrown plot or a cluttered construction site, we will clear it safely and lawfully and leave it ready for the next stage. Tell us about the site, attach any photos or plans, and we will arrange a free survey and a fixed-price quotation.

    020 8914 7838

    Speak directly to our team · Mon–Fri 09:00–17:00

    • Safety-first, CDM 2015 compliant
    • 24-hour quote response
    • Fixed price after a free site survey

    Prefer email? Send details or large drawings to hello@stripandclearservices.co.uk.

    Call NowRequest a Quote