Skip to content
Mobilisation often within a few days
STRIP & CLEARSERVICESLTD

Professional soft strip specialists

Soft Strip Demolition in London & the South East

Soft strip demolition is the controlled removal of a building's non-structural elements, such as ceilings, partitions, floor coverings, fixtures, fittings and redundant mechanical and electrical services, while the structural frame stays in place. It prepares a building for refurbishment, fit-out or full demolition, and separates materials for recycling before the structure is touched.

  • Structure left intactOld fit-outs cleared without harm
  • Back to a clean shellReady for fit-out or demolition
  • Segregated for recycling95%+ diversion target · transfer notes
  • From £15–£40 per m²Fixed price after a free survey
Two operatives removing plasterboard from a stud partition during an office soft strip
Strip to shell, ready for fit-outOffices · retail · hospitality · residential

Planning a soft strip ahead of a refurbishment or demolition? We survey the building, agree the scope and give you a fixed-price quotation. We respond to every enquiry within 24 hours.

Request a Free Site Survey

When is a soft strip needed?

When Do You Need a Soft Strip?

A soft strip is usually the first physical stage of a project. Taking out everything that is not structural exposes the frame for inspection, separates materials while they are still clean, and gives the next contractor a safe, empty building to start from. Typical situations include:

  • Refurbishing a commercial building, where the old fit-out has to come out before the new design goes in.
  • Changing tenants in offices, shops and hospitality premises, when the outgoing fit-out must be removed back to shell.
  • Preparing for full demolition. Stripping first recovers metals, timber and other materials, making the structural demolition cleaner and cheaper to dispose of.
  • Clearing redundant services, from old ductwork and cable trays to plant, after the services have been isolated.
  • Converting or renovating residential property, from a single flat to a whole building, where kitchens, bathrooms, flooring and partitions are coming out.

Every project is assessed individually, so the scope, access and safety requirements are agreed before work begins.

Before a soft strip begins, the building normally needs a refurbishment and demolition asbestos survey to the HSE's HSG264 guidance. The survey is usually arranged by the client, or we can coordinate it. Any licensed asbestos removal is priced separately.

What's included

What's Included in a Soft Strip

The scope is always agreed with you, but a soft strip usually covers four groups of work.

  • Ceilings & Floors

    Suspended ceiling grids and tiles, raised access floors, carpets, vinyl and screeds where specified, taken out and separated by material.

  • Partitions & Joinery

    Stud and glazed partitions, doors, frames, built-in furniture, counters and shop-fit joinery.

  • M&E & Services

    Redundant ductwork, cable trays, lighting, pipework, sanitaryware and plant, removed once the services have been safely isolated by the appropriate trades.

  • Fixtures, Fittings & Waste

    Everything else that is not part of the structure, cleared and segregated as it comes out, with the waste removed under duty of care and the area left clean for the next stage.

The difference

Soft Strip or Structural Demolition: What's the Difference?

The two are often confused, and many projects need both. The difference comes down to what is removed and what stays.

Soft strip compared with structural demolition

  • What is removed

    Soft strip
    Non-structural elements: ceilings, partitions, floors, fixtures, services
    Structural demolition
    Load-bearing elements, or the whole building
  • The structure

    Soft strip
    Stays in place
    Structural demolition
    Removed in whole or in part
  • Typical purpose

    Soft strip
    Refurbishment, fit-out or preparation for demolition
    Structural demolition
    Clearing the site for redevelopment
  • Working methods

    Soft strip
    Mainly hand tools and compact equipment, working floor by floor
    Structural demolition
    Machinery, in a planned demolition sequence
  • Waste

    Soft strip
    Mixed streams separated at source: metals, timber, plasterboard, general
    Structural demolition
    Mostly heavy inert material such as brick and concrete

When a building is being replaced, a soft strip comes first and structural demolition follows. Stripping first means the valuable and recyclable materials are recovered cleanly rather than lost in a pile of rubble.

Retail unit half stripped out, showing the old shop fit on one side and bare shell on the other

Buildings we strip

Buildings We Strip

The principle is the same in every building: remove what is not structural, keep what is, and separate everything for recycling. The detail changes with the type of building.

  • OfficesPartitions, suspended ceilings, raised floors and redundant M&E, taken back to a clean shell for the next fit-out.
  • Retail unitsShopfits, counters, fixtures and flooring cleared ready for a new tenant.
  • Commercial kitchensKitchen lines, extraction canopies and associated services removed once gas, water and electrics have been isolated.
  • Hotels and hospitalityBedrooms, bathrooms and back-of-house areas stripped floor by floor.
  • M&E strip outsRedundant ductwork, cable trays, pipework and plant cleared from ceiling voids and plant rooms.
  • Warehouses and industrial buildingsRacking, mezzanines, offices and services cleared down to the slab.
  • Residential propertyKitchens, bathrooms, flooring and partitions stripped from flats and houses ahead of renovation.

How it works

Our Soft Strip Process

  1. Site survey & assessment

    We visit, discuss your requirements and agree exactly what is being removed and what stays, before preparing a fixed-price quotation.

  2. Planning & RAMS

    We plan access, sequencing and waste routes and prepare risk assessments and method statements under CDM 2015.

  3. Controlled soft strip

    CSCS-carded operatives remove the agreed elements in a logical order, typically ceilings and services first, then partitions, joinery and floor finishes, keeping materials separated.

  4. Clearance & handover

    Waste is removed with full paperwork, final checks are completed and the building is handed back as a clean shell, ready for the next stage.

From the first visit to handover, you are kept informed about the scope, programme and progress. We work to the Construction (Design and Management) Regulations 2015.

Ready to get started?

Planning a Soft Strip Out Project?

Whether you are preparing a commercial building for refurbishment or taking a property back to its frame, speak to our team and get a fixed-price quotation.

Free site survey · Fixed price after survey · Segregated waste with full paperwork

Why choose us

Why Choose Us for Your Soft Strip

  • Experienced, carded teams

    CSCS and CCDO-trained operatives, with the right equipment chosen for each building.

  • Safety-focused planning

    CDM 2015 compliant RAMS and site-specific planning on every job, however small.

  • Responsible waste clearance

    Segregation at source and full duty of care paperwork from a registered waste carrier, targeting 95%+ landfill diversion.

  • One contractor, start to finish

    Soft strip, enabling works and clearance are carried out in-house, followed by demolition if the project needs it.

We hold £10m public liability and employers' liability insurance, and the business is owner-run, with Harry John Hudson directly involved in projects.

Client testimonials

What Our Clients Say About Our Work

Google reviews

4.9/5

45+ reviews

Feedback from clients on demolition, strip out and site preparation projects.

  • “The Strip and Clear guys sorted our soft strip out in Surrey. Came in, stripped the office back to shell, took all the waste away and left it tidy. No messing about. Would use them again.”
    James TCommercial Soft Strip
  • “Used Strip & Clear for the demo and site clearance on a job in London. Lads turned up on time, cracked on with the strip and knock down, and got the site cleared properly with the transfer notes sorted. No drama. Good crew.”
    Dave M, Site ManagerDemolition & Site Clearance
  • “Strip & Clear Services Ltd handled the dig out and groundworks for us on a site in Kent. Professional team, clear communication and the ground was prepared exactly as agreed. Happy to recommend.”
    Sarah Collins, Apex DevelopmentsDig Out & Groundworks

Cost

How Much Does a Soft Strip Cost?

Soft strip out typically costs £15–£40 per m². Small jobs start from around £1,500, and typical commercial strip outs range from £5,000 to £25,000 or more. Where a project sits in that range depends on the floor area, how densely the space is fitted out, how much M&E is being removed, access, restricted working hours and the type of waste. A light strip of ceilings and carpets costs far less than a full strip with M&E, raised floors and partitions.

Soft strip guide prices

  • Small residential soft strip

    Approximate size
    2-bed flat
    Guide price
    £1,800 – £3,500
    Typically includes
    Kitchen, bathroom, flooring, partitions
  • Retail unit strip out

    Approximate size
    200–400 m²
    Guide price
    £4,000 – £12,000
    Typically includes
    Shop fitting, fixtures, flooring
  • Office soft strip

    Approximate size
    500–1,000 m²
    Guide price
    £8,000 – £22,000
    Typically includes
    Ceilings, partitions, flooring, some M&E

These are 2026 guide prices for London and Surrey, excluding VAT. Your fixed price is confirmed after a free site survey, and our price guide covers every service in more detail.

Frequently asked questions

Soft Strip FAQs

Why do soft strip prices vary so much per square metre?

The range of £15–£40 per m² reflects how much is packed into the space. An open floor with carpet tiles and a simple ceiling strips quickly. A heavily fitted floor with partitions, raised access flooring and dense M&E takes far longer and produces more waste streams. Access and working hours make a difference too.

Is a soft strip the same as demolition?

No. A soft strip removes non-structural elements and leaves the building's frame standing. Demolition removes structure. Many projects need both, with the soft strip done first.

Do you remove mechanical and electrical services?

Yes. Redundant ductwork, cable trays, pipework, lighting and plant are part of most soft strips. They are removed only after the services have been safely isolated.

How long does a soft strip take?

It depends on the floor area, how much is being removed, access and any working-hour restrictions. A small flat is very different from a multi-storey office. We give you a programme with the quotation once we have seen the building.

What happens to the waste from a soft strip?

Materials are separated as they come out (metals, timber, plasterboard, inert and general waste) and removed under duty of care with waste transfer notes. We target 95%+ of waste diverted from landfill.

Do I need an asbestos survey before a soft strip?

Usually, yes. A refurbishment and demolition asbestos survey is normally required before intrusive work starts. It is usually arranged by the client, or we can coordinate it for you.

Still have questions about your project?

Request a free quote

Tell Us About Your Project

Complete the short form below and our team will contact you to discuss your demolition or site preparation requirements.

Floor plans, drawings or photos (optional)

    Your details will only be used to respond to your enquiry. See our privacy policy.

    Get your free quote

    Get a Quote for Your Soft Strip

    Whether it is a single retail unit, an office floor or a whole building, tell us about it and attach floor plans or photos. We'll arrange a free survey and a fixed-price quotation.

    020 8914 7838

    Speak directly to our team · Mon–Fri 09:00–17:00

    • Safety-first, CDM 2015 compliant
    • 24-hour quote response
    • Fixed price after a free site survey

    Prefer email? Send details or large drawings to hello@stripandclearservices.co.uk.

    Call NowRequest a Quote